|
|
|
|
|
|
 |
 |
 |
 |
There are no files attached to this article. |
 |
 |
Images: |
 |
 |
 |
 |
| |
Download: (153KB) |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Download: (194KB) |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Download: (144KB) |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Download: (136KB) |
|
 |
 |
 |
 |
 |
 |
| |
|
|
|
|
|

|
|
|
|
|
|
 |
 |
 |
 |
 |
 |
| |
Celtic Solar innovate at the University of Exeter A bespoke installation kit was made by GENERSYS for Celtic Solar, providing an attractive 'picture f ...read more |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Wellcroft Engineering installs solar at Chesterfield Royal Hospital Wellcroft Engineering installation of 40 GENERSYS 1000-10 solar panels for Chesterfield Royal Hospit ...read more |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Genersys Panels at the World’s most southerly point What is the furthest South that solar thermal panels have been installed? Who installed them? ...read more |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
On high mountains: Zugspitze A research station measuring atmospheric pollution atop the highest peak in Germany, some 2,650 metr ...read more |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Thermo-siphon solar systems A look at the widespread use of simple but effective solar systems in Cyprus, and the possibile appl ...read more |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
View case studies |
|
| |
|
|
|
|
|

 |
|
|
|
|
|
|
 |
 |
 |
 |
 |
 |
| |
Get paid for your GENERSYS Solar Water Heating There has never been a better time to choose GENERSYS solar water heating for your home, pool or bus ...view download |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Commissioning form for solar panel installers Commissioning guidelines and procedures for Genersys solar panel installers. ...view download |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Large capacity solar tanks by Genersys Meeting the demand from installers, GENERSYS performance and reliability is finally available in com ...view download |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Power from the People Unrivalled 20 year warranty positions GENERSYS as the UK’s leading solar panel brand. ...view download |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Digital solar controller GENERSYS DC12 wiring diagram Clear diagram illustrating electrical wiring and connections for the DC12. Connect the digital solar ...view download |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
View downloads |
|
| |
|
|
|
|
|

 |
|
|
|
|
|
|
 |
 |
 |
 |
 |
 |
| |
Renewable Heat Incentive scheme The Renewable Heat Incentive (RHI) is the new Government grants scheme set to reward users based on ...read more |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Phase 2 LCBP is a Disaster Robert Kyriakides continues to push for Lord Trucott to address the failings of the Phase 2 Low Carb ...read more |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Lord Truscott’s reply fails TO ADDRESS THE ISSUES Lord Truscott's response to Genersys' letter to Alistair Darling, of the Department of Trade and Ind ...read more |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Genersys expose flaws in Phase 2 Low Carbon Buildings Program Robert Kyriakides, Chief Executive of Genersys has written to Alistair Darling, Secretary of State f ...read more |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
Genersys at the London School of Economics Genersys Chief Executive, Robert Kyriakides, gave a seminar at the London School of Economics on 17t ...read more |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
| |
View news articles |
|
| |
|
|
|
|
|

|
|
| |
WELLCROFT ENGINEERING INSTALLS SOLAR AT CHESTERFIELD ROYAL HOSPITAL
by Genersys Plc |
|
 |
 |
 |
| |
 |
|
| Chesterfield Royal Hospital. |
|
|
 |
|
| The four arrays of 10 x GENERSYS 1000-10 solar panels. |
|
|
 |
|
| The GENERSYS 1000-10 solar panels bein installed. Piping yet to be insulated. |
|
|
|
Wellcroft Engineering installation of 40 GENERSYS 1000-10 solar panels for Chesterfield Royal Hospital’s New Acute Ward Block.
This project is located at the rear of Chesterfield Royal Hospital within the Trust’s grounds and is their biggest building expansion since phase 2 of the hospital was built over 20 years ago. The solar panels were carefully positioned on the roof to minimise been visible from public view while on the Trust’s grounds or the neighboring golf course meaning the panels were mounted at 30 degrees.
The 4 storey new acute ward block comprising a lower ground level plant room and three ward levels above was our second experience working with GB Building Solutions of which we have built a very good working relationship over the past contracts. This project has a particularly long pipe run and incorporates two pump stations running in parallel to overcome the head and flow rate required. The main storage is via two 2000 litre calorifiers with direct solar and constant temperature heating coils. The solar system is separated via a plate heat exchanger and the secondary side incorporates a separate shunt pump to feed calorifiers as a separate sealed system.
Client: Chesterfield Royal Hospital Main contractor: GB Building Solutions Size: 80m2 Storage: 4000 Litres Usage: Three Acute Wards Solar Panel: Genersys 1000-10 Completion: August 2010 |
|
| |
|
|
| |
enquiries@genersys-solar.com |
|
|
|
|
|
|